Deskripsyon
A large repair was made week of Feb. 1-5, 2016, to street after water main repair. The new asphalt is crumbling, pieces are all over the street, being flung onto tree box and sidewalks and parked cars. Also being washed into storm drains.
1 Komento
Kinilala DC 311 (Rehistradong User)